Satoshi Royalty One

Bitcoin · AI Infrastructure · Geothermal Energy

Power is
the bottleneck.
We own it.

Satoshi Royalty One is a vertically integrated infrastructure company combining operational Bitcoin mining, sovereign AI datacenter capacity, and proprietary geothermal energy technology.

Our PlatformInvestor Relations
12 MW
Operating Today
Carrizo Springs, TX
542 MW+
Total Pipeline
Mining · AI · Power
3+ GW
Powered Land
510 MW signed MOUs
$195M/yr
Peak AI Revenue
Year 15 steady state

The Platform

Three verticals.
One capital structure.

01
Bitcoin MiningOperational

12 MW running today in Carrizo Springs, Texas.

A 300 MW Capital Partner hardware contract in place — SRO carries zero upfront capex. Power cost: $0.045/kWh, top decile nationally. Cash flow positive from day one. The mining operation funds the platform while larger infrastructure is built.

Learn more →
12 MW
$0.045/kWh
02
Sovereign AI DatacenterFlorida OZ

133,000 sq ft built for compute that can't run on public cloud.

Bay County, Florida Opportunity Zone. 13 modular DCT units — one deployed per year. GPU-less architecture delivers 300× cost advantage over NVIDIA H100 clusters. SRO receives 24.75% of net revenue in perpetuity, secured by a first-position lien on the real estate. Peak revenue: $195M/year.

Learn more →
$195M/yr peak
24.75% perpetual
03
Geothermal Energy IPPatent Pending

A structural energy-cost advantage no competitor can buy.

Patent-pending geothermal well repurposing technology co-invented by Clark Swanson and Ro Shirole — assigned directly to SRO. Delivers always-on, low-cost baseload power across the full 542 MW pipeline. Not licensed in. Not available to competitors. Underpins every phase of the platform.

Learn more →
Assigned to SRO
Licensing pathway
04
Powered Land3+ GW Pipeline

Sites secured before capital is deployed.

Power-ready, entitled land across multiple U.S. markets — screened for power availability, water access, and fiber connectivity. 510 MW in signed MOUs: 310 MW Bitcoin mining, 200 MW AI hyperscaler. Early utility engagement de-risks interconnection timelines.

Learn more →
3+ GW
510 MW signed MOUs

Carrizo Springs, Texas

Operational infrastructure.
Day one cash flow.

Leadership

Operators who have built
and exited at scale.

CS
Clark Swanson
Co-Founder & CEO
Co-Inventor, Geothermal Patent

Co-founded Blockcap in 2020 and exited to Core Scientific in a $4.6B transaction ($1.46B to Blockcap). Took Blackline Safety public on the TSX, scaled to $500M market cap. Economics degree from Pepperdine; MBA with distinction from Graziadio.

$1.46B exit · Blockcap → Core Scientific (Nasdaq: CORZ)
RS
Ro Shirole
Co-Founder & COO
Co-Inventor, Geothermal Patent

Developed 600 MW of mining infrastructure at Saxet Infrastructure. Led $1B+ in enterprise value at Compute North. Grew Compass Mining's enterprise value +400% as Chief Growth Officer.

600 MW developed · $1B+ enterprise value originated
$3.5B+ Enterprise Value Originated$2B+ Mining Infrastructure Built$1.46B Exit · Blockcap → Core Scientific

Connect with SRO

Energy partners, equipment vendors, and accredited investors can reach us directly.

Investor RelationsContact Us